[Saudigazette]Pakistan’s K2 nuclear reactor completes thermal testing
The thermal testing will be followed by nuclear fuel loading and grid-connected power generation. The HFT, spread over several weeks, includes simulating nuclear power plant operations to verify the reliability of the main equipment and systems under thermal conditions before the reactor is loaded with nuclear fuel. The outer ...